Acid and Base bench

Status: | Standard operating procedures | Safety protocols | Reservation is not required

Training prerequisites: General cleanroom training. Working with HF and piranha requires additional training.
Training contact: Madina Zhelbuldina
Technical contact: Arman Tuigynbek, Zhanibek Balgin

Air-Control CS-50D High Performance Chemical Wet Process Station

  • A full wet station-width leak containment tub/exhaust plenum, underneath the work-surface
  • Lip exhaust around all bath or well perimeters for localized high velocity fume containment
  • Complete PLC/HMI interface and control of all wet bench system parameters
  • Fire-retardant polypropylene meeting UL 94 V/0 specification with segmented work surface constructed in 1/2" thick PVDF for enhanced acid and temperature resistance
  • Acid/base neutralization system with chemical dosing pump system, pH robe and pump feature
  • Meets UL 61010-1/CE Mark and ASHRAE 110 requirements