Acid and Base bench
Status: |
Standard operating procedures |
Safety protocols |
Reservation is not required
Training prerequisites: General cleanroom training. Working with HF and piranha requires additional training.
Training contact: Madina Zhelbuldina
Technical contact: Arman Tuigynbek, Zhanibek Balgin
Air-Control CS-50D High Performance Chemical Wet Process Station
- A full wet station-width leak containment tub/exhaust plenum, underneath the work-surface
- Lip exhaust around all bath or well perimeters for localized high velocity fume containment
- Complete PLC/HMI interface and control of all wet bench system parameters
- Fire-retardant polypropylene meeting UL 94 V/0 specification with segmented work surface constructed in 1/2" thick PVDF for enhanced acid and temperature resistance
- Acid/base neutralization system with chemical dosing pump system, pH robe and pump feature
- Meets UL 61010-1/CE Mark and ASHRAE 110 requirements